Schedule of Condition in Chilham
DMP was contacted, in advance, and asked to produce a Schedule of Condition Survey on current conditions for a property in Chilham.
The property was set to have engineering works done but these could pose a detrimental effect to the surrounding properties.
A detailed written and photographic report was compiled for each property, with a subsequent re-inspection once the works were completed to make sure all was safe and well.


